- New Construction
- General Construction
- Education Project
Built on the UC San Diego campus, the new 5,300 square foot storage facility will house non-hazardous waste on a temporary basis for weekly or bi-weekly pickup and off-site disposal. The building includes a loading dock with 2 loading bays, office, walk-in freezer, telecommunications room and an accessible restroom. The new construction is CMU to match the existing Campus Service Complex concrete block aesthetic.